Holden Building Charlotte, NC Case Studies
New Construction
Marion Diehl Tennis Pavilion - Charlotte, NC
- Timeframe: 8 months
- Description: New locker rooms and offices for various Queens University teams. Work included all site work, building foundations, slab on grade, wood framed building, aluminum storefronts, metal panels, epoxy floor system, lockers, HVAC system, Plumbing system and electrical system.
- Budget: $1,700,000.00
New Construction

MSA Swim Facility - Charlotte, NC
- Timeframe: 6 months
- Description: New indoor 10 lane 25 yard pool facility. Work included all site work, concrete foundations, concrete slab on deck, masonry walls, pre-engineered metal building package, pool construction, starting blocks, flags, pumps, plumbing system, mechanical system and electrical system.
- Budget: $200,000.00
Double Oaks Family Aquatics Center - Charlotte, NC
- Timeframe: 8 months
- Description: New outdoor pool with pump room, office and locker room buildings. Work consisted of Grading of site, building foundations, building slab on grade, masonry walls, stone veneer, exposed wood timber roof deck construction, adhered roofing membrane, fiberglass doors were exposed to chemicals, lockers, toilet partitions, complete pool construction, 20’ high slide, fencing, plumbing, mechanical and electrical.
- Budget: $3,000,000.00
CPCC CDL Lab - Huntersville, NC
- Timeframe: 7.5 months
- Description: New classroom, apparatus bay, offices and driving course construction. Work consisted of grading 3 acres with retention pond & retaining wall, concrete paving, new 4,000 square foot building with masonry walls with decorative metal panels, aluminum storefronts, flooring, ceilings, monitored plumbing system to report water flow, mechanical systems and monitored electrical systems to track electrical intake.
- Budget: $3,500,000.00
Salisbury Fire Station 6 (Under Construction) - Salisbury, NC
- Timeframe: 14 months
- Description: New fire station and training facility which includes climbing walls, tower training area, confined space training. Work consists of all site work, concrete foundations, poured in place walls, slab on grade with slab on grade concrete work, masonry walls, metal stud walls, brick veneer, metal panel siding, conventional steel built apparatus bay, pre-engineered metal building living quarters, millwork, tiered flooring for training room, fixed seating, flooring, ceilings, overhead doors, folding doors, sprinkler system, mechanical system with radiant heat in the apparatus bay, and electrical system including data.
- Budget: $6,500,000.00
Mecklenburg Swim Association Long Course (Under Construction) - Charlotte, NC
- Timeframe: 6 months
- Description: New indoor 4 lane 50 yard pool facility. Work included all site work, concrete foundations, concrete slab on deck, masonry walls, pre-engineered metal building package, pool construction, starting blocks, flags, pumps, bulkheads, plumbing system, mechanical system and electrical system.
- Budget: $2,400,000.00
Upfits
NC National Guard Roof Replacement & Building Renovation - Salisbury, NC
- Timeframe: 3 months
- Description: Abatement of asbestos tile and lead in firing range. Selective demo of all roofing, floors, ceiling, HVAC boilers, and lightning fixtures. New work consisted of all new built up roofing & associated insulation tapered for proper drainage, new gutters, downspouts, floors, ceilings, paint, HVAC boilers, HVAC grillers, electrical fixtures, new generator, and new propane gas service.
- Budget: $100,000.00
Providence Country Club Renovation - Salisbury, NC
- Timeframe: 2 months
- Description: Selective demo of existing bar area, formal dining area and informal dining area. Removed walls, flooring, existing bar, plumbing, mechanical, and electrical. New work consisted of building of new walls, wine wall to display bottles, new bar, all new flooring, all new paint & wall coverings, plumbing and electrical.
- Budget: $445,000.00
Bell Equipment Office Upfit - Cornelius, NC
- Timeframe: 1 month
- Description: Selective demo of existing flooring, cabinets, walls, built in millwork and ceilings. New work consisted of additional walls, new doors, new flooring, new paint, new ceilings, sprinkler head re-location, plumbing and electrical.
- Budget: $42,500.00
Charlotte Christian Pool Grounds Upfit - Charlotte, NC
- Timeframe: 1 month
- Description: Selective demo included exterior fence, exterior siding where needed, removed popcorn ceilings, removed electrical fixtures. New work consisted of additional fencing around pool and equipment, sealing/patching of existing parking area to make more useable, siding repairs where wood was rotten, new decking where rotten, painting of pool clubhouse exterior & interior and electrical upgrades.
- Budget: $54,000.00
HFFA Locker Room Renovations (In Progress) - Huntersville, NC
- Timeframe: 2 months
- Description: Selective demo of all flooring, partitions, millwork, electrical fixtures, and plumbing fixtures. New work consists of all new flooring, paint, partitions, plumbing and electrical fixtures, millwork and counter tops.