Salisbury Fire Station 6
Budget: $6,500,000.00
Location: Salisbury, NC
Timeframe: 14 months
Description: New fire station and training facility which includes climbing walls, tower training area, confined space training. Work consists of all site work, concrete foundations, poured in place walls, slab on grade with slab on grade concrete work, masonry walls, metal stud walls, brick veneer, metal panel siding, conventional steel built apparatus bay, pre-engineered metal building living quarters, millwork, tiered flooring for training room, fixed seating, flooring, ceilings, overhead doors, folding doors, sprinkler system, mechanical system with radiant heat in the apparatus bay, and electrical system including data.
Double Oaks Family Aquatics Center
Budget:$3,000,000.00
Location:Charlotte, NC
Timeframe:8 months
Description:New outdoor pool with pump room, office and locker room buildings. Work consisted of Grading of site, building foundations, building slab on grade, masonry walls, stone veneer, exposed wood timber roof deck construction, adhered roofing membrane, fiberglass doors were exposed to chemicals, lockers, toilet partitions, complete pool construction, 20’ high slide, fencing, plumbing, mechanical and electrical.
Marion Diehl Tennis Pavilion
Budget: $1,700,000.00
Location: Charlotte, NC
Timeframe: 8 months
Description:New indoor 4 lane 50 yard pool facility. Work included all site work, concrete foundations, concrete slab on deck, masonry walls, pre-engineered metal building package, pool construction, starting blocks, flags, pumps, bulkheads, plumbing system, mechanical system and electrical system.